Maintenance Deviation Review
Predictive maintenance decision assurance · Asset RADAR-042 · synthetic scenario
Select a demonstration path
Configurable rule · MNT-AUTH-020
Deferral over 24 hours requires Authorized Engineering Approver approval.
Asset
- Asset
- RADAR-042
- Asset Type
- Radar subsystem
- Site
- Coastal Station 3 (fictional)
- Operating Status
- Active
- Scheduled Inspection
- Due 30 Sep 2026 · 06:00
- Decision Status
- Pending review
Illustrative AI Recommendation
Not produced by Thales or cortAIx
DEFER MAINTENANCE
Defer the scheduled inspection by 72 hours based on recent equipment telemetry and the maintenance summary.
Sources cited by the AI
- Telemetry TEL-042-7781
- Technical baseline rev 2.1
- Maintenance summary MR-0042-19
GreenLight Independent Validation
GreenLight Decision
Pre-execution hold
HOLD
Approval required
The recommended action cannot proceed until the evidence discrepancy is resolved and the authorized engineer approves the specific deviation.
Approval
Required — reconcile the baseline, then the Authorized Engineering Approver must approve this deviation
Preventive mode: GreenLight holds this action until the checks above are resolved.
GreenLight does not ask another AI model whether the original AI was correct. It retrieves the evidence, evaluates deterministic rules and verifies who may approve.Illustrative interface only. No live equipment or approval system connected.