caseway
Greenlight
Independent AI Decision Assurance for Mission-Critical Workflows
Thales demonstration · synthetic scenarios · illustrative AI recommendations
MNT-2026-0042

Maintenance Deviation Review

Predictive maintenance decision assurance · Asset RADAR-042 · synthetic scenario

Select a demonstration path
Configurable rule · MNT-AUTH-020
Deferral over 24 hours requires Authorized Engineering Approver approval.

Asset

Asset
RADAR-042
Asset Type
Radar subsystem
Site
Coastal Station 3 (fictional)
Operating Status
Active
Scheduled Inspection
Due 30 Sep 2026 · 06:00
Decision Status
Pending review

Illustrative AI Recommendation

Not produced by Thales or cortAIx
DEFER MAINTENANCE

Defer the scheduled inspection by 72 hours based on recent equipment telemetry and the maintenance summary.

Sources cited by the AI
  • Telemetry TEL-042-7781
  • Technical baseline rev 2.1
  • Maintenance summary MR-0042-19

GreenLight Independent Validation

GreenLight Decision

Pre-execution hold
HOLD
Approval required

The recommended action cannot proceed until the evidence discrepancy is resolved and the authorized engineer approves the specific deviation.

Approval
Required — reconcile the baseline, then the Authorized Engineering Approver must approve this deviation

Preventive mode: GreenLight holds this action until the checks above are resolved.

GreenLight does not ask another AI model whether the original AI was correct. It retrieves the evidence, evaluates deterministic rules and verifies who may approve.Illustrative interface only. No live equipment or approval system connected.